Do you have any question about this SAP term?
Component: LO-VC
Component Name: Variant Configuration
Description: Configured order BOM that is saved as result-oriented with manual changes made.
Key Concepts: Result-oriented order BOM is a feature of the LO-VC Variant Configuration component of SAP. It allows users to create a bill of materials (BOM) for an order that is based on the desired result, rather than the components that are needed to achieve it. This allows for more efficient and accurate production planning. How to use it: To use result-oriented order BOM, users must first define the desired result in the system. This includes specifying the characteristics of the product, such as size, color, and material. Once this is done, the system will automatically generate a BOM that contains all of the components needed to produce the desired result. Tips & Tricks: When using result-oriented order BOM, it is important to ensure that all of the necessary components are included in the BOM. This can be done by double-checking the BOM before it is used for production planning. Additionally, it is important to keep track of any changes that are made to the BOM, as this can affect production planning. Related Information: For more information about result-oriented order BOM and how to use it in SAP, please refer to SAP’s official documentation on LO-VC Variant Configuration. Additionally, there are many online resources available that provide tutorials and tips on using this feature.