1. SAP Glossary
  2. Meter Reading
  3. base period


What is base period in SAP IS-U-DM-MR - Meter Reading?


SAP Term: base period

  • Component: IS-U-DM-MR

  • Component Name: Meter Reading

  • Description: Period used as a basis for determining expected consumption or demand during an extrapolation.


Smart SAP Assistant

  • Key Concepts: 
    Base period is a term used in the SAP IS-U-DM-MR Meter Reading component. It is a period of time that is used to define the start and end dates of a meter reading cycle. The base period is used to determine when meter readings should be taken and when bills should be generated. 
    
    How to use it: 
    The base period can be set up in the SAP system by entering the start and end dates of the meter reading cycle. This information can then be used to generate bills for customers based on their meter readings. The base period can also be used to track usage over time and identify any discrepancies in meter readings. 
    
    Tips & Tricks: 
    It is important to ensure that the base period is set up correctly in order to ensure accurate billing and usage tracking. It is also important to ensure that all meter readings are taken within the specified base period in order to ensure accuracy. 
    
    Related Information: 
    For more information on setting up a base period in SAP IS-U-DM-MR Meter Reading, please refer to the SAP Help documentation. Additionally, there are many online resources available that provide detailed instructions on how to set up a base period in SAP IS-U-DM-MR Meter Reading.
    • Do you have any question about this SAP term?


      Upgrade now to chat with this SAP term.

Related SAP Glossary Terms

Click the links below to see the following related SAP glossary terms:
Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant