Do you have any question about this SAP term?
Component: IS-EC-CEM
Component Name: Construction Equipment Management
Description: Equipment, for example a crane, which is usually kept on a specific site for a specific period of time. This period of time is always calculated in days for time-based equipment. Generally speaking, settlement of time-based equipment takes place on the basis of the shipping documents. Performance-based equipment documents are not taken into account in the settlement run in order to avoid settlement taking place twice, once on the basis of the shipping document and once on the basis of the performance-based equipment document. Both equipment items and multipart equipment can be time-based.
Key Concepts: Time-based equipment is a component of SAP’s Construction Equipment Management (IS-EC-CEM) module. It allows users to track and manage the usage of construction equipment over time. This includes tracking the amount of time each piece of equipment is used, as well as the cost associated with its usage. How to use it: Time-based equipment can be used to track and manage the usage of construction equipment over time. This includes tracking the amount of time each piece of equipment is used, as well as the cost associated with its usage. The user can also set up alerts for when a piece of equipment needs to be serviced or replaced. Tips & Tricks: When using time-based equipment, it is important to keep accurate records of the usage and cost associated with each piece of equipment. This will help ensure that all costs are accounted for and that any necessary maintenance or replacement is done in a timely manner. Related Information: For more information on SAP’s Construction Equipment Management (IS-EC-CEM) module, please visit the SAP website at https://www.sap.com/products/construction-equipment-management.html.