Do you have any question about this SAP term?
Component: CO-PC
Component Name: Product Cost Controlling
Description: The status for material ledger master data in a posting period: New objects Period opened Price change completed Values entered Quantities and values entered Price determined at single level Price determined multilevel Closing entry performed Closing entry reversed
Key Concepts: Period status in SAP CO-PC Product Cost Controlling is a feature that allows users to control the period in which cost estimates and actual costs are posted. It is used to ensure that all postings are made in the correct period and that the data is accurate. The period status can be set to open, closed, or locked. How to use it: To use the period status feature, users must first set the period status for each period. This can be done by going to the “Period Status” tab in the SAP CO-PC Product Cost Controlling module. From there, users can select the desired period and set its status to open, closed, or locked. Tips & Tricks: It is important to remember that when setting the period status, it should be done for all periods in order to ensure accuracy of data. Additionally, it is important to note that once a period has been set to “closed” or “locked”, it cannot be changed back to “open”. Related Information: For more information on using the period status feature in SAP CO-PC Product Cost Controlling, please refer to the official SAP documentation. Additionally, there are many online tutorials and videos available that provide step-by-step instructions on how to use this feature.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP Glossary term explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |