Do you have any question about this SAP term?
Component: AP-PPE
Component Name: FND Integrated Product and Process Engineering
Description: A resource type designed for production lines that use takt-based scheduling. The line resource determines working times and the rates of the line.
Key Concepts: Line resource is a component of the SAP AP-PPE FND Integrated Product and Process Engineering module. It is used to define the resources that are required to produce a product or service. This includes machines, tools, personnel, and other resources that are necessary for production. Line resources are used to plan and manage production processes, as well as to track the utilization of resources. How to Use it: Line resource can be used to define the resources that are needed for production. This includes machines, tools, personnel, and other resources that are necessary for production. The line resource can be used to plan and manage production processes, as well as to track the utilization of resources. The line resource can also be used to calculate the cost of production and optimize the use of resources. Tips & Tricks: When using line resource, it is important to ensure that all necessary resources are included in the definition. This will help ensure that all resources are accounted for when planning and managing production processes. Additionally, it is important to ensure that all resources are tracked accurately so that the utilization of resources can be monitored. Related Information: The SAP AP-PPE FND Integrated Product and Process Engineering module also includes other components such as process flow diagrams, process control diagrams, and process control systems. These components can be used in conjunction with line resource to optimize production processes and ensure efficient utilization of resources.