Do you have any question about this error?
Message type: E = Error
Message class: VY - Messages for freight processing
Message number: 301
Message text: Planification du transport pas encore terminée pour livraison &
Copying control for billing requires the copying of shipment costs from
the shipments belonging to this delivery.
Because this delivery is relevant for shipment scheduling, but shipment
scheduling is not yet completed, the shipment costs cannot be
determined fully.
Billing is not complete.
Check whether shipments are planned for this delivery.
If no shipments are planned, set the delivery as not relevant for
shipment scheduling by entering a suitable route in the delivery or
transportation blocking reason.
If shipments are to be formed for the delivery, then shipment
scheduling must be completed and the costs calculated for the shipments
relevant for shipment costs.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
VY301
- Planification du transport pas encore terminée pour livraison & ?Get instant SAP help. Start your 7-day free trial now.
VY300
*** Déclarations pr facturation frais transp. ***
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
VY255
Création de sous-postes impossible pour base(s) de calcul &1
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
VY302
Aucun transport n'a pu être déterminé pour la livraison &
Quelle est la cause de ce problème? Copying control for billing requires that shipment costs are copied from the shipments belonging to this delive...
VY303
Livraison & : pas de transport pertinent pour le fret
Quelle est la cause de ce problème? Copying control requires that the shipment costs are copied from the shipments belonging to this delivery. This...
Cliquez sur ce lien pour rechercher tous les messages SAP.