Do you have any question about this error?
Message type: E = Error
Message class: V4 - Nachrichten Verkauf (Variable Meldungen und EDI-Meldungen)
Message number: 004
Message text: Date début valid. fabrication postérieure à date fin valid. fabrication
You have entered a start date for cumulative production which is later
than the end date for cumulative production.
The system does not accept the entry or gives a warning message.
Please correct the entry in both data fields in cumulative production.
If both fields have not been correctly maintained, the cumulative
production go-ahead quantity, which is only for information purposes,
will not be able to be correctly determined.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
V4004
- Date début valid. fabrication postérieure à date fin valid. fabrication ?Get instant SAP help. Start your 7-day free trial now.
V4003
La date du bon de livraison indiqué ne correspond pas à celle du flux doc
Quelle est la cause de ce problème? You have entered a delivery date belonging to the last delivery note posted for this customer. It does not agre...
V4002
Le bon de livraison indiqué n'existe pas dans le flux de documents
Quelle est la cause de ce problème? You have entered the delivery note number for the last delivery note posted for this customer. Because it could...
V4005
Date début lancement article postérieure à date fin lancement article
Quelle est la cause de ce problème? You have entered a material go-ahead start date that is later than the material go-ahead end date.Réponse du s...
V4006
Période de valid. fabric. plus longue que période de valid. de l'article
Quelle est la cause de ce problème? You have entered a period for production go-ahead that is larger than the period for material go-ahead.Réponse...
Cliquez sur ce lien pour rechercher tous les messages SAP.