Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: V1 - Verkaufsbelegbearbeitung
Message number: 347
Message text: Opération &1 &2 &3 non définie
This combination of item category &V1& and MRP type for material
&V2& is not allowed.
INCLUDE 'NA_NO_PROCESSING_1' OBJECT DOKU ID TX LANGUAGE E
INCLUDE 'NA_CHECK_ENTRY' OBJECT DOKU ID TX LANGUAGE E
You can display the combination defined in table TVEPZ, which controls
scheduling line category determination, and change it as required if you
have the authorization to do so. The MRP type for the material may
be changed in the material master.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
V1347
- Opération &1 &2 &3 non définie ?Get instant SAP help. Sign up for our Free Essentials Plan.
V1346
La période & indiquée n'est pas définie
Quelle est la cause de ce problème? <GL:date_type>Date type</> &V1& is not allowed. INCLUDE 'NA_NO_PROCESSING_1' OBJE...
V1345
Date &1 avec période &2 non valable
Quelle est la cause de ce problème? <GL:date_type>Date type</> &V2& does not correspond to the date format.Comment corriger cet...
V1348
Type d'échéance & non défini ici
Quelle est la cause de ce problème? This <GL:schedule_line_category>schedule line category</> &V1& is not allowed in combinatio...
V1349
Erreur de système: Poste supérieur & non défini
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
Cliquez sur ce lien pour rechercher tous les messages SAP.