How To Fix STPC103 - Ressource &1 non affectée aux date/heure &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: STPC - Messages for Valuation of Confirmations

  • Message number: 103

  • Message text: Ressource &1 non affectée aux date/heure &2

  • Show details Hide details
  • Quelle est la cause de ce problème?

    No link was established between the iPPE resource and
    <DS:GLOS.3526B5C8AFAB52B9E10000009B38F974>Overhead Cost Controlling</>.

    Réponse du système

    The system cannot determine any costs for the activity in Short-Term
    Production Costs.

    Comment corriger cette erreur?

    In iPPE, go to the <ZK>factory layout</> and enter the <ZK>worker</> or
    <ZK>operating facilities</> and choose <ZK>Load.</> Choose the
    <ZK>Costs</> tab and enter a reference to the CO-relevant master data
    <DS:GLOS.3526B5D5AFAB52B9E10000009B38F974>cost center</>/
    <DS:GLOS.35289F0F9C4A1941E000080009927D9B>activity type</> or
    <DS:GLOS.3526B66EAFAB52B9E10000009B38F974>business process</> by
    selecting the corresponding data. The assignment of this CO master data
    to the iPPE resource gives the iPPE resource a price (activity price)
    which is then used both in costing and for confirmation.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP STPC103 - Ressource &1 non affectée aux date/heure &2 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker