Do you have any question about this error?
Message type: E = Error
Message class: RM - Messages for Repetitive Manufacturing
Message number: 078
Message text: Erreur lors du calcul du coût de revient
The system cannot determine a cost estimate which the system uses to
proposes the backflushed activity quantities.
There are several causes for this problem.
You define the cost estimate the system is to use to propose the
activity quantities in repetitive manufacturing, in the control
parameters of the repetitive manufacturing profile.
Backflush on the basis of the preliminary costing - product cost
collector
If you have defined, for example, that the backflush is to be carried
out on the basis of a
<DS:GLOS.3526B76FAFAB52B9E10000009B38F974>preliminmary costing</> for a
<DS:GLOS.3526B6F2AFAB52B9E10000009B38F974>product cost collector</>,
you must also have created a preliminary costing for the cost
collector.
Note that you cannot create a preliminary costing for a product cost
collector with the
<DS:GLOS.36F138F91B385A9EE10000009B38F984>controlling level</> "product
cost plant/planning plant".
Backflush on the basis of the standard cost estimate - material
You must have created a
<DS:GLOS.3526B6DFAFAB52B9E10000009B38F974>standard cost estimate</> for
the <DS:GLOS.3526BEB5AFAB52B9E10000009B38F974>material</>.
It must be a <DS:GLOS.3526B719AFAB52B9E10000009B38F974>cost estimate
with quantity structure</>. This standard cost estimate must be flagged
and released.
If a material is to be produced in repetitive manufacturing, you must
set the indicator <DS:DE.SA_SAUFT>Repetitive mfg</> in the MRP view of
the material master record before you create the standard cost estimate
for the material. The system only updates the costs per operation in
repetitive manufacturing if you have set this indicator.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
In the repetitive manufacturing profile, check what option the system
is to use to propose the activity quantities. It may make sense to
change the existing setting if, for example, you have defined that the
backflush is to be carried out on the basis of the standard cost
estimate but you actually work with a generic cost collector.
Check whether a preliminary costing for the cost collector or a flagged
and released standard cost estimate for the material exists. To do
this, branch to the information system of Product Cost Controlling.
Set the indicator <LS>repetitive mfg</> in the material master record.
If necessary, create the missing cost estimate.
To create a standard cost estimate for the material, branch to the menu
of Product Cost Planning.
To create a preliminary costing for the cost collector, branch to the
menu for Periodic Product Controlling.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
RM078
- Erreur lors du calcul du coût de revient ?Get instant SAP help. Start your 7-day free trial now.
RM076
Aucun processus de confirmation à exécuter n'a été sélectionné
Quelle est la cause de ce problème? You did not select a backflushing process.Comment corriger cette erreur? Choose at least one process.Extrait d...
RM075
La réserve de travail est vide pour ces options de sélection
Quelle est la cause de ce problème? The system could not find any backflush processes still to be posted for the selection options you entered. Eit...
RM079
Art. & de la division & non défini comme article de comptage
Quelle est la cause de ce problème? The repetitive manufacturing profile of material &V1& does not allow for reporting point backflushing.R...
RM080
Saisie de donn. réelles au pnt de ctptge imposs. pour art. & , div. &
Quelle est la cause de ce problème? The reporting point backflush is not allowed for material &V1& in plant &V2&. The reporting poi...
Cliquez sur ce lien pour rechercher tous les messages SAP.