Message type: E = Error
Message class:  RI - Projects: commercial reporting 
Message number: 109
Message text: Pas de périm. de résultat affecté au périm. ana. &
The project/WBS element &V2& is assigned to controlling area &V1&.
However, controlling area &V1& is not assigned to an operating concern.
The checks could not be made.
Assign controlling area &V1& to an operating concern, or make the
checks omitting the settlement rule check.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
RI108 & vérifié : présence d'incohérences
Quelle est la cause de ce problème?   &V1& was checked in accordance with the settings entered. Inconsistencies were found.  There may also b...
RI107 & vérifié : présence d'erreur(s)
Quelle est la cause de ce problème?   &V1& (and connected objects) was checked in accordance with the settings entered.  Errors and inconsist...
RI110 Vérifications terminées -> Cf. protocole
Quelle est la cause de ce problème?   The checks have been completed successfully.  The result of the check is stored as a log.Réponse du système  ...
RI111 & & &
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
Cliquez sur ce lien pour rechercher tous les messages SAP.