Do you have any question about this error?
Message type: E = Error
Message class: REMPT - Message Class for REM Planning Table (Rel. 99)
Message number: 320
Message text: Type de capacité du poste de travail &1 changé en &2
The basis the system uses for scheduling and to calculate capacity
requirements is not the same. A possible explanation is that you
entered a capacity in the scheduling screen of the work center in the
"Capacity" field.
Please refer to the OSS note 119596 for more detailed information.
You have not entered a capacity category in the work center under
"Scheduling".
The system used the first capacity category from the capacity view in
the work center.
Do not use the "Capacity" field in the scheduling view of the work
center if you work with the REM planning table.
Enter a capacity category in the work center under "Scheduling".
Extrait du message d'erreur du système SAP. Copyright SAP SE.
REMPT320
- Type de capacité du poste de travail &1 changé en &2 ?Get instant SAP help. Start your 7-day free trial now.
REMPT316
Planification à court ou moyen terme et séquencement simultanément actifs
Quelle est la cause de ce problème? Detailed or rate-based scheduling and sequecing are all active at the same time.Comment corriger cette erreur? ...
REMPT315
Pas de dates de prod. pour article &1, version &2, ligne de production &3
Quelle est la cause de ce problème? The planned order has no production dates for the combination of material, production version and production li...
REMPT321
Ordonnancement et calcul des capacités de & ont des bases différentes
Quelle est la cause de ce problème? The basis used for scheduling and to calculate the capacity requirements are different. This can cause inconsis...
REMPT350
***************** Ordres plan./de fabr./de process *******************
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
Cliquez sur ce lien pour rechercher tous les messages SAP.