How To Fix QACT059 - Le principe de double contrôle n'a pas été respecté.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: QACT - TMS: Quality Assurance & Check Tools

  • Message number: 059

  • Message text: Le principe de double contrôle n'a pas été respecté.

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The dual control principle was not followed. When editing requests from
    the QA worklist, the user requires QTEA authorization. This
    authorization exists but the user is still unable to perform the step in
    question. The processor is the same user who created the request.

    Réponse du système

    The program is interrupted.

    Comment corriger cette erreur?

    Another user with QTEA authorization must process the request, to ensure
    that the dual control principle is followed. The administrator can also
    do this.

    Procédure pour les administrateurs système

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP QACT059 - Le principe de double contrôle n'a pas été respecté. ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker