How To Fix PPH_MRP146 - Planificat. avec besoins prévisionnels non supportée ds MRP Live on HANA


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 146

  • Message text: Planificat. avec besoins prévisionnels non supportée ds MRP Live on HANA

  • Show details Hide details
  • Quelle est la cause de ce problème?

    A forecast exists for the material and the forecast requirements are to
    be considered in the planning run. However, the MRP Live on HANA run
    does not support the planning of forecast requirements.
    Note:
    Do not confuse forecast requirements with planned independent
    requirements. MRP Live on HANA supports the planning of planned
    independent requirements. With regard to forecasts, MRP Live on HANA
    supports the following scenarios:
    Execution of a forecast for the total consumption. The forecast itself
    is not relevant to planning but can be used as the basis for planned
    independent requirements which are included in the MRP Live on HANA run.
    Execution of a forecast for the calculation of the reorder point and
    safety stock for consumption-based planning.

    Réponse du système

    The MRP Live report plans the material using classic MRP.

    Comment corriger cette erreur?

    The planning run using classic MRP may be slower than the planning run
    using MRP Live on HANA. To enable the planning of the material in MRP
    Live on HANA, proceed as follows:
    Check whether the material was included in a forecast recently. If the
    material was only included in forecasts in the past for which forecast
    requirements still exist, they will prevent the material from being
    included in the MRP Live on HANA run. In this case, delete the forecasts
    or select an MRP procedure that does not take account of the forecast.
    If the forecast is executed for the total consumption and included in
    the planning run (for example, for the MRP procedure ?VV?), you can
    define a similar process by setting the planning strategy group ?10?
    (make-to-stock) in the material master and selecting an MRP procedure
    that enables the execution of the forecast for the total consumption
    whereby the forecast is not relevant to planning. Then you can use the
    forecast as the basis for planned independent requirements which can be
    included in the MRP Live on HANA run.

    Procédure pour les administrateurs système

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP PPH_MRP146 - Planificat. avec besoins prévisionnels non supportée ds MRP Live on HANA ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.