Message type: E = Error
Message class: PPC0 - Messages for PP Confirmation
Message number: 042
Message text: Les mouvements de stocks sont à nouveau déterminés.
The <ZK>Goods Movements</> screen has been accessed before. Materials
for the goods issue and goods receipt are determined again because of
subsequent changes to the relevant quantities (quantity, unit of measure
or cancellation indicator) or because of changes to the key information
for the reporting points to be confirmed. Changes that had been
previously made for individual materials as well as unplanned goods
movements are lost.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Check the goods movements again and change or add data for the goods
movements before saving the confirmation, if necessary.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
PPC0042
- Les mouvements de stocks sont à nouveau déterminés. ?Get instant SAP help. Start your 7-day free trial now.
PPC0041
Des témoins existent déjà ; Les différences ne peuvent être déterminées.
Quelle est la cause de ce problème? Settings have been made for the determination of the goods movements and activities for the matrix order that y...
PPC0040
La définition de répartition pr site &1 n'est pas complètement gérée.
Quelle est la cause de ce problème? You want to enter a confirmation in location &v1&. The distribution definition has been maintained only...
PPC0043
Activités de production sont à nouveau définies
Quelle est la cause de ce problème? The <ZK>Production Activities</> screen has been accessed before. The production activities are det...
PPC0044
Mouvements de stock et activités de production sont à nouveau définis
Quelle est la cause de ce problème? The <ZK>Goods Movements</> and <ZK>Production Activities </> screens have been accessed...
Cliquez sur ce lien pour rechercher tous les messages SAP.