How To Fix PK193 - Stratégie impossible pour magasin non pris en compte par MRP


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PK - Production - KANBAN

  • Message number: 193

  • Message text: Stratégie impossible pour magasin non pris en compte par MRP

  • Show details Hide details
  • Quelle est la cause de ce problème?

    In the strategy selected, material flow is controlled by the kanban.
    Replenishment (for example, run schedule quantities or purchase orders)
    is planned in the planning run. This strategy is only allowed if the
    material in the storage location allocated to the supply area is
    included in the planning run.

    Comment corriger cette erreur?

    Either select another strategy or change the MRP type of the material in
    the MRP area so that it is included in planning. Alternatively, you can
    delete the assignment to the MRP area.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP PK193 - Stratégie impossible pour magasin non pris en compte par MRP ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author