Do you have any question about this error?
Message type: E = Error
Message class: PEP - Schedule Manager: Messages
Message number: 232
Message text: Le noeud succédant au noeud NODE_ID = & n'a pas été trouvé.
One of the tasks refers to a subsequent task that does not
exist. This is not
possible.
Technical information: All tasks with the same task group are connected
to one another in a chain. The content of the
NSIBLING_ID field refers to the
NODE_ID node of the next task in the chain.
If none of the tasks in the task group have this NODE_ID,
the task list is faulty.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
PEP232
- Le noeud succédant au noeud NODE_ID = & n'a pas été trouvé. ?Get instant SAP help. Start your 7-day free trial now.
PEP231
Les noeuds NODE_ID = &1 et &2 terminent tous les deux le groupe de tâches
Quelle est la cause de ce problème? One of the task groups has more than one final task. This is not possible. Technical information: All tasks wit...
PEP230
Impossible d'appeler le groupe de tâches du noeud NODE_ID = &.
Quelle est la cause de ce problème? The task group that this task belongs to is not triggered in the task list. Technical information: The task gro...
PEP233
Le noeud succédant au noeud NODE_ID = & est ds un autre groupe de tâches.
Quelle est la cause de ce problème? One of the tasks in the task group refers to a subsequent task that does not appear in the same task group. Thi...
PEP234
Une boucle apparaît dans le groupe de tâches du noeud NODE_ID = &.
Quelle est la cause de ce problème? One of the tasks in the task group refers to a subsequent task that refers back to the original task, possibly ...
Cliquez sur ce lien pour rechercher tous les messages SAP.