Do you have any question about this error?
Message type: E = Error
Message class: PE - Shift Planning: Messages
Message number: 584
Message text: Il existe déjà une affectation pour les données indiquées
The current shift group already contains a shift abbreviation for the
data (daily work schedule, variant, attendance, absence, availability)
of the shift you are attempting to create.
Example:
A shift abbreviation GL with the daily work schedule GLZ and variant A
already exists. It is not possible to create another shift abbreviation
GX with a daily work schedule GLZ and variant A.
The specifications of shift abbreviations within a shift group must
differ from one another. The shift will not be saved if this is not the
case.
Check whether you really need the new shift abbreviation with these
specifications and, if necessary, choose a valid abbreviation.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
PE584
- Il existe déjà une affectation pour les données indiquées ?Get instant SAP help. Start your 7-day free trial now.
PE583
Besoin déjà existant, période modifiée
Quelle est la cause de ce problème? A requirement has already been defined for the period &V1& to &V2&. This is different from the ...
PE582
Erreur de structure du plan de roulement individuel pour &
Quelle est la cause de ce problème? An error occurred while creating the personal work schedule for employee &V1&.Réponse du système The...
PE585
Erreur lors définition période de & le &
Quelle est la cause de ce problème? When the periods for reading the time evaluation results were being determined, an error occurred for person &a...
PE586
Sélectionnez une seule et unique ligne
Quelle est la cause de ce problème? You are currently working in the function 'Additional Info'. This function enables you to indicate wh...
Cliquez sur ce lien pour rechercher tous les messages SAP.