How To Fix O1063 - Période de planification différente de EQ (anc./nvelle : &/&) &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: O1 - IS-Oil : Message pool exchanges

  • Message number: 063

  • Message text: Période de planification différente de EQ (anc./nvelle : &/&) &

  • Show details Hide details
  • Quelle est la cause de ce problème?

    Scheduling from-to date /
    <DS:GLOS.delivery date>delivery date</> for the document item differs
    from <DS:DE.OIA_SMENGE>corresponding quantity schedule</>
    delivery date.
    &SYSTEM_RESPONSE& / &SYSTEM_MESSAGE&
    In document maintenance (SD and MM), this message is controlled by
    Table T160M. If defined as an error, an INFO-message appears; if
    defined as a warning, a SUCCESS-message appears (default is 'E').

    Comment corriger cette erreur?

    Go to quantity schedule maintenance. Before leaving QS, a popup is
    displayed asking if you want the QS data to be the same as the document
    item data.
    Maintain the quantity schedule manually (depending on the
    <DS:DE.OIA_CSEGI>QS permission indicator</>).
    &reference&
    <DS:NA.O1061>Message O1061 if item quantity changed</>

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP O1063 - Période de planification différente de EQ (anc./nvelle : &/&) & ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author