Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here →
Message type: E = Error
Message class: O1 - IS-Oil : Message pool exchanges
Message number: 010
Message text: Total & de qté & < quantité du poste & &
Scheduling line total is less than the item qty. It is possible to have
a lower &V1& than the item qty. (this is merely a reminder that you
think about whether you want this situation or not).
&SYSTEM_RESPONSE& / &SYSTEM_MESSAGE&
This message is controlled by table T160M as a system message.
If the message type is 'W' a W-Message appears,
if it is defined as an E-Message, a popup window appears to let you
decide whether or not the &V1& qty. should be changed (default type = E
= Popup - several options to allocate the quantities exist).
Decide whether the &V1& in the scheduling lines should be increased and
if so, by how much.
If no quantities have been called-off, we recommend that you use
"Restructure QS" if you want a sum of &V1& like item qty.
If quantities have already been called-off, we recommend the option
"Allocate quantities", where you get a popup to decide how much
quantity you want to allocate (less than or equal to the proposal,
which is the difference between the item qty. and &v1& qty.)
Option select relevant lines "to be allocated" before you press the
button (allocate only to selected lines <regular/uniform>)
Option without selecting single lines (allocate by date entered
<from/to>).
If no differences between the item qty. and the &v1& qty. exist, you
can use this function for rounding numbers off (only).
Extrait du message d'erreur du système SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
O1009 Total & de qté & > quantité du poste & &. Corrigez (restructurer ?)
Quelle est la cause de ce problème? The sum of all the scheduling lines exceeds the item qty.Réponse du système The sum of the &V1& quan...
O1008 Poste positionné sur période act. -> retour arrière posssible
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
O1011 Qté disp. EQ = &, poste &, qté req.= & (&)
DEFINE &QS& = '<GL:quantity_schedule>quantity schedule</>'Quelle est la cause de ce problème? <ZH>ERROR:</&...
O1012 Poste de date SM & en dehors de &-& de EQ &
DEFINE &QS& = '<GL:quantity_schedule>quantity schedule</>'Quelle est la cause de ce problème? The <DS:GLOS.goods ...
Cliquez sur ce lien pour rechercher tous les messages SAP.