Do you have any question about this error?
Message type: E = Error
Message class: NAA - Subsequent settlement (Purchasing)
Message number: 640
Message text: Dte de mise à jour &1 en dehors de la pér. de validité de l'accord
Update date &V1& is outside the validity period of arrangement &V2&.
The update date is changed to the start date (&V3&) or end date (&V4&)
of the validity period of arrangement &V2&.
Please note that the update date has been changed, and if necessary take
account of the resulting changes to the assignment of business volume
date to a period (in the case of arrangements settled periodically).
The document date of the material document or invoice verification
document is used as the update date in the case of updating at the time
of goods receipt or invoice verification, or the delivery date of the
schedule line is used as the update date in the case of data updated
from the purchase order/delivery schedule. In the case of Settlement
Management documents (supplier billing documents and settlement
documents), the posting date (billing date) is used as the update date.
In some cases, the update date is changed to the start or end date of
the arrangement validity period if the original date is not within the
arrangement validity period (e.g. as a result of a data input error).
In the case of arrangement settled periodically, if the update date
falls in a period for which settlement accounting has already been
performed, business volumes are assigned to the next period for which
settlement accounting is due. The update date is changed accordingly.
This procedure ensures realtime inclusion of business volumes during
subsequent settlement.
For invoice verification documents entered in Release 3.0, the posting
date of the invoice verification document is used for the subsequent
update of business volume data. The "Document date" field in the PO
history is empty in the case of these documents.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
NAA640
- Dte de mise à jour &1 en dehors de la pér. de validité de l'accord ?Get instant SAP help. Start your 7-day free trial now.
NAA639
Date comptable/facture &1 a été reprise comme dte de mise à jour
Quelle est la cause de ce problème? The posting/billing date &V1& was adopted as the update date.Réponse du système Le système émet un...
NAA638
Date de livr. &1 reprise de l'échéancier comme date de mise à jour
Quelle est la cause de ce problème? The delivery date &V1& of the schedule line was adopted as the update date.Réponse du système Le sys...
NAA641
Dte de mise à jour &1 se situe ds une période déjà décomptée
Quelle est la cause de ce problème? Update date &V1& falls in a period (&V3& to &V4&) of arrangement &V2& for which...
NAA642
La date de mise à jour a été ajustée à la date &1
Quelle est la cause de ce problème? The update date is changed to date &V1&.Réponse du système The update date is changed to date &V...
Cliquez sur ce lien pour rechercher tous les messages SAP.