Message type: E = Error
Message class: MN - Message class for subsequent settlement (Purchasing)
Message number: 443
Message text: Le calendrier de l'accord & a été repris du type d'accord
The <GL:arrangement>rebate arrangement</> belonging to
<GL:arrangement_type>arrangement type</> &V1& has been assigned the
<GL:arrangement_calendar>arrangement calendar</> &V2&, but the
arrangement type has been assigned the arrangement calendar &V3&.
The rebate arrangement &V4& created as a result of the extension has
the arrangement calendar &V3& belonging to arrangement type &V1&.
The validity period of the arrangement will be adjusted accordingly.
For arrangements with a <GL:settlement_calendar>settlement calendar</>
(<GL:partial_settlement>periodic partial settlements</>), the number of
period-specific conditions may change.
<GL:period-specific_condition>Period conditions</> may be adjusted by
means of a correction mechanism.
Please check the result of the extension process. Note any further
messages.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
MN442 Le calendrier de l'accord du type & a été supprimé
Quelle est la cause de ce problème? The <GL:arrangement_calendar>arrangement calendar</> &V3& is assigned to <GL:arrangement...
MN441 Prolongation de tous les accords (consultez le texte descriptif)
Quelle est la cause de ce problème? You have not entered any restricting selection criteria for the <GL:arrangement>rebate arrangements</&...
MN444 Le calendrier de décompte & a été repris du type d'accord
Quelle est la cause de ce problème? The <GL:arrangement>rebate arrangement</> to be extended, belonging to <GL:arrangement_type>a...
MN445 Accord &4 non prolongé (calendrier de décompte incohérent)
Quelle est la cause de ce problème? <GL:arrangement>Rebate arrangement</> &V4& belonging to <GL:arrangement_type>arrangem...
Cliquez sur ce lien pour rechercher tous les messages SAP.