How To Fix MN409 - La période de validité de l'enreg.de cond. a été adaptée (vérifiez)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MN - Message class for subsequent settlement (Purchasing)

  • Message number: 409

  • Message text: La période de validité de l'enreg.de cond. a été adaptée (vérifiez)

  • Show details Hide details
  • Quelle est la cause de ce problème?

    A main condition record belonging to rebate arrangement &V1& has a
    validity period that does not conform with that of the arrangement
    (&V3& - &V4&).
    During the periodic extension of the rebate arrangement, this condition
    record was adopted in the extended arrangement. In the process, the
    validity period of the extended arrangement was chosen as the
    applicable validity period.

    Réponse du système

    The condition record was adopted. The associated period conditions will
    be adjusted. See further messages.

    Comment corriger cette erreur?

    Check rebate arrangement &V2& with regard to the validity periods of
    the condition records - in particular, the validity periods of the
    period conditions.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP MN409 - La période de validité de l'enreg.de cond. a été adaptée (vérifiez) ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker