Message type: E = Error
Message class: MN - Message class for subsequent settlement (Purchasing)
Message number: 019
Message text: Période de validité accord incompatible avec le calendrier de l'accord
The validity end date of a <GL:arrangement>rebate arrangement</> that
is subject to periodic extension can be uniquely determined from the
<GL:arrangement_calendar>arrangement calendar</> (&V3&).
The correct date was automatically suggested to you by the system
(&V1&).
The date you entered manually - &V2& - differs from the
system-suggested date.
The system will allow your entry, but draws your attention to its
negativev effects.
Please check the date.
SAP advises against entering a different date, since this will cause
difficulties in extending the rebate arrangement.
Please refer to the notes on longer-term rebate arrangements (which you
can access via the F1 help for the "Arrangement calendar" field, for
example).
Extrait du message d'erreur du système SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
MN018 Calendrier accord & n'est pas géré pour la période postérieure au &
Quelle est la cause de ce problème? The system attempted to read the end date of the rebate arrangement validity period from the arrangement calend...
MN017 Le calendrier & est actuellement désactivé dans le système
Quelle est la cause de ce problème? The system attempted to read calender &V1&. However, this calendar no longer exists in the system.Répo...
MN020 Le document de décompte a déjà été préparé pour mise à jour
Quelle est la cause de ce problème? You have already carried out a settlement run for the rebate arrangement currently being processed. This resul...
MN021 Code "Ristournes" pour organisme pay. & et organis.achat & non géré
Quelle est la cause de ce problème? The indicator for "subsequent settlement" has not been maintained for supplier &V1&.Réponse ...
Cliquez sur ce lien pour rechercher tous les messages SAP.