Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 404
Message text: &1 : &2 (N2)
In the MRP list, this exception message displays:
that the planned order was newly created in the last planning run
that the opening date of the planned order lies in the past
The opening period is a time buffer that is planned to provide the
MRP controller with the time necessary for converting planned orders
or purchase requisition.
If the planned order can be converted (to a purchase requisition or
to a production order), it should be converted as quickly as possible.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
MD404
- &1 : &2 (N2) ?Get instant SAP help. Start your 7-day free trial now.
MD403
&1 : &2 (N1)
Quelle est la cause de ce problème? In the MRP list, this exception message displays that the order proposal was newly created in the last planning...
MD402
&1 : &2 (A9)
Quelle est la cause de ce problème? Not used at the moment.Réponse du système Le système émet un message d'erreur et ne vous permettra pas de ...
MD405
&1 : &2 (N3)
Quelle est la cause de ce problème? In the MRP list, this exception message displays that the order proposal was newly created in the last planning...
MD406
&1 : &2 (N4)
Quelle est la cause de ce problème? In the MRP list, this exception message displays, that the order proposal was newly created in the last plannin...
Cliquez sur ce lien pour rechercher tous les messages SAP.