How To Fix MD128 - La date de départ ne s'applique pas à des entrées fixes


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MD - Material Requirements Planning (MRP)

  • Message number: 128

  • Message text: La date de dĂ©part ne s'applique pas Ă  des entrĂ©es fixes

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You want to take firmed receipts/issues into account and have scheduled
    the start of the planning period.

    Réponse du système

    The start date of the planning period is valid for independent
    requirements but not for firmed receipts/issue.
    Otherwise, production orders, for example, could be included in the
    planning run without considering the reservations earlier on the time
    axis.

    Comment corriger cette erreur?

    It is less effective to set a start date in the future that takes
    firmed receipts/issues into account.
    It is more effective to schedule a start date in the past if the
    independent requirements in the past (but after start date) are also to
    be taken into account.
    If a start date is not scheduled, independent requirements in the past
    are not taken into account.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP MD128 - La date de dĂ©part ne s'applique pas Ă  des entrĂ©es fixes ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant