Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 119
Message text: Adaptez les dates pour les versions des besoins indépendants
You changed the planning period of the scenario so that the validity
period of one or more planned independent requirements versions no
longer lies within the planning period.
If you have maintained the validity periods for the planned independent
requirements, the system checks whether they lie within the planning
period for the scenario.
Adjust the validity periods of the versions to suit the planning
period.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
MD119
- Adaptez les dates pour les versions des besoins indépendants ?Get instant SAP help. Start your 7-day free trial now.
MD118
La date & se situe en dehors de l'intervalle de planification
Quelle est la cause de ce problème? You entered a start or finish date for the versions to be used that lies outside the period of the scenario tha...
MD117
Erreur lors de la sauvegarde des divisions pour le scénario
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
MD120
La division & est déjà affectée
Quelle est la cause de ce problème? A planning scenario can only be assigned to a plant once.Réponse du système Le système émet un message d'e...
MD121
Vous n'avez pas encore affecté de versions de bes. indép. prévisionnels
Quelle est la cause de ce problème? To carry out long-term planning with a planning scenario, you must determine which independent requirements ver...
Cliquez sur ce lien pour rechercher tous les messages SAP.