How To Fix KW113 - Aucune ressource système pour l'étape parallèle &1


KW113 - Overview

  • Message type: E = Error

  • Message class: KW - CO-ABC Activity-Based Costing

  • Message number: 113

  • Message text: Aucune ressource système pour l'étape parallèle &1

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You have scheduled the template allocation as a background job with the
    server group &V3&. This leads to parallel processing. The scheduling of
    the prallel step &V1& failed after &V2& attempts due to a lack of
    system resources in the server group &V3&.

    Réponse du système

    The parallel processing cannot be completed or is not possible.

    Comment corriger cette erreur?

    Repeat the template allocation (if appropriate, only for the affected
    selection packages) and choose another server group that has more
    system resources.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


KW113 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker