Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix KW042 - Pas d'autorisation pour modifier le groupe de processus de gestion


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KW - CO-ABC Activity-Based Costing

  • Message number: 042

  • Message text: Pas d'autorisation pour modifier le groupe de processus de gestion

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You are not authorized to change business process group &v2& in
    controlling area &v1&.

    Réponse du système

    You cannot change the hierarchy assignment or the assignment to the
    business process group.

    Comment corriger cette erreur?

    Have your authorization checked when creating or changing business
    processes or specify another business process group.
    Deleting business processes also involves changing the assigned
    business process group, since the business process must be removed from
    the business process group.
    Therefore have your authorization for changing business process groups
    checked.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP KW042 - Pas d'autorisation pour modifier le groupe de processus de gestion ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author