Do you have any question about this error?
KW
›
KW033
Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 033
Message text: Délimiter la période d'analyse (schéma de processus équivoque)
The template entered in the master record is used for the function you
have chosen.
If you have selected the analysis period large enough to enable the
assignment of various templates within this period, the chosen function
cannot be performed.
No further processing is carried out.
Reduce the analysis period so that exactly one process template is
assigned to the business process or cost center, and choose the
required function again.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KW033
- Délimiter la période d'analyse (schéma de processus équivoque) ?Get instant SAP help. Start your 7-day free trial now.
KW032
Modification non possible (présence d'enregistrements dépendants)
Quelle est la cause de ce problème? The attributes cannot be changed since business processes exist in the period in question, for which correspond...
KW031
Il n'y a pas eu de processus de gestion sélectionné
Quelle est la cause de ce problème? No business processes were selected in period &v1& through &v2&. This can have the following re...
KW034
Aucun schéma type n'est affecté
Quelle est la cause de ce problème? A template must be assigned for the function you have chosen.Réponse du système No further processing is car...
KW035
La création du processus de gestion a été interrompue
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
Cliquez sur ce lien pour rechercher tous les messages SAP.