Do you have any question about this error?
KPN
›
KPN008
Message type: E = Error
Message class: KPN - Costing: Networks, Projects
Message number: 008
Message text: L'activité & n'a pu être valorisée à la date prévue
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
An internal error has occurred.Costing by schedule was not possible for this activity. This may be due
to an error in scheduling or failure to maintain the capacity
requirement distribution key.
In the case of internally-processed activities, valuation is at the
rate for the first period; planned costs are distributed over the whole
duration of the activity. Distribution keys entered in the activity or
the work center are ignored.
Schedule the order again or make sure that the capacity requirement
distribution key is correctly maintained.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KPN008
- L'activité & n'a pu être valorisée à la date prévue ?Get instant SAP help. Start your 7-day free trial now.
KPN007
Le plan de fact. de l'activ. & ne comprend pas de poste sign. pr les cts
Quelle est la cause de ce problème? There is an invoicing plan for activity &V1& for which there is no cost-relevant item.Réponse du systÃ...
KPN006
Le réseau & n'a pu être bloqué
Quelle est la cause de ce problème? Someone is currently working on network &V1&.Réponse du système The production run does not determin...
KPN009
Le plan de fact. du compos. & ne contient pas de poste signif. pr les cts
Quelle est la cause de ce problème? There is an invoicing plan for component &V1& for which there is no cost-relevant item.Réponse du syst...
KPN010
Un plan de facturation activé dans un document ne peut être géré
Quelle est la cause de ce problème? The invoicing plan you have chosen as template is already in use in another context - for example, as the invoi...
Cliquez sur ce lien pour rechercher tous les messages SAP.