Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 287
Message text: Le prix standard calculé est trop important
The price for &V1& calculated within price calculation is so high that
it exceeds the field limits.
To prevent a field overflow and therefore an abnormal termination, the
price is set to 0. A possibly planned update is not carried out.
Check the cost debits and the activity quantities for &V1&. The problem
might be caused by an error in planning.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KP287
- Le prix standard calculé est trop important ?Get instant SAP help. Start your 7-day free trial now.
KP286
Itération interrompue après &V1& étapes
Quelle est la cause de ce problème? The iteration of &V3& in controlling area &V2& was exited after &V1& steps. After these...
KP285
Relation d'activité entre objets ayant des devises différentes
Quelle est la cause de ce problème? In the price calculation, you specified that the object currency amounts are to be iterated independently. This...
KP288
Débordement de zone dans l'itération
Quelle est la cause de ce problème? Within the iteration for the price calculation resp. for the plan reconciliation, a field overflow occurred for...
KP289
Traitez les périodes spéciales et les périodes standard séparément
Quelle est la cause de ce problème? You have called up the predistribution of fixed costs for the periods &V3& through &V4&. In the...
Cliquez sur ce lien pour rechercher tous les messages SAP.