Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 267
Message text: Relations d'activités par itération partielle
In iterative activity price calculation, an activity relationship was
determined between cost center &V1&, activity type &V2& and cost center
&V3&, activity type &V4&. Cost center &V1& is not included in the
partial quantity to be iterated. The iterative network is therefore not
complete, which can lead to calculated activity prices which do not
agree with those resulting from an overall iteration.
The activity relationship is transfered, but it is not complete.
Check the activity relationship. If a manually-set activity price
existsfor cost center &V1&, activity type &V2&, the relationship is
correct. If an iterative activity price exists, you should check
whether iterative relationships were used. If in doubt, run activity
price calculation for the entire controlling area.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KP267
- Relations d'activités par itération partielle ?Get instant SAP help. Start your 7-day free trial now.
KP266
Proc. gestion &1 sans numéro d'objet
Quelle est la cause de ce problème? The master data for business process &V1& is faulty. The internal field "Object number" is no...
KP265
Une erreur s'est produite pendant la mémorisation
Quelle est la cause de ce problème? During activity price calculation posting, a serious system error occurred. The calculation, however, has alrea...
KP268
Emetteur d'une imputation d'activité non trouvé
Quelle est la cause de ce problème? In the iterative activity price calculation framework, a relationship between &V1& and &V2& was...
KP269
L'objet & n'est pas présent mais il a des enreg. d'activités.
Quelle est la cause de ce problème? In activity price calculation, activity quantities were read in for object &V1&. However, the object is...
Cliquez sur ce lien pour rechercher tous les messages SAP.