KP267 - Overview

  • Message type: E = Error

  • Message class: KP - CO-OM Planning

  • Message number: 267

  • Message text: Relations d'activités par itération partielle

  • Show details Hide details
  • Quelle est la cause de ce problème?

    In iterative activity price calculation, an activity relationship was
    determined between cost center &V1&, activity type &V2& and cost center
    &V3&, activity type &V4&. Cost center &V1& is not included in the
    partial quantity to be iterated. The iterative network is therefore not
    complete, which can lead to calculated activity prices which do not
    agree with those resulting from an overall iteration.

    Réponse du système

    The activity relationship is transfered, but it is not complete.

    Comment corriger cette erreur?

    Check the activity relationship. If a manually-set activity price
    existsfor cost center &V1&, activity type &V2&, the relationship is
    correct. If an iterative activity price exists, you should check
    whether iterative relationships were used. If in doubt, run activity
    price calculation for the entire controlling area.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


KP267 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author