Do you have any question about this error?
Message type: E = Error
Message class: KOSA - Product Cost Collector
Message number: 120
Message text: Pas de CCR prév./mixte pour niv. ctrle de gest. "div. prod./div. planif."
You have assigned the plant-specific material view to the
<DS:GLOS.36F138F91B385A9EE10000009B38F984>Controlling level</>
Production Plant/Planning Plant. In this case, <ZH>no
<DS:GLOS.3526B76FAFAB52B9E10000009B38F974>preliminary cost estimate</>
</> can be created for a
<DS:GLOS.3526B6F2AFAB52B9E10000009B38F974>product cost collector</> for
the material. <DS:GLOS.3526B774AFAB52B9E10000009B38F974>Work in process
</> and <DS:GLOS.359A41323EC34A00E10000009B38F984>scrap variances</>
must therefore be valuated using the
<DS:GLOS.3526B6DFAFAB52B9E10000009B38F974>standard cost estimate</>.
If you want to confirm activity quantities in repetitive manufacturing,
the repetitive manufacturing profile must be assigned to a material
that allows confirmation with the data of the standard cost estimate.
It is not possible to confirm the activities on the basis of the
preliminary cost estimate for the product cost collector. If the
standard cost estimate is used, the confirmation of activities is based
on the routing in the standard cost estimate, which can differ from the
routing in the production version in question. There can be problems
with the valuation of work in progress and scrap variances in the
following situations:
If the task list type and task list group of the routing used in the
standard cost estimate differs from the routing of the production
version
If the reporting point structure is changed
Furthermore, <ZH>no <DS:GLOS.3526B72EAFAB52B9E10000009B38F974>mixed
costing</></> is possible when using the Controlling level Production
Plant/Planning Plant for the material.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
If you wish to avoid the following restrictions, discontinue processing
and select the Controlling level Production Version or BOM/Routing for
the material. Note that SAP recommends using the Controlling level
Production Version. Especially in repetitive manufacturing, you should
always use the Controlling level Production Version.
See the documentation <LS>Product Cost Controlling</> for additional
information on the Controlling level.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KOSA120
- Pas de CCR prév./mixte pour niv. ctrle de gest. "div. prod./div. planif." ?Get instant SAP help. Start your 7-day free trial now.
KOSA119
Règle par défaut STR reprise
Quelle est la cause de ce problème? A <DS:GLOS.3526B69EAFAB52B9E10000009B38F974>default rule</> was specified in the default values for...
KOSA118
Il n'est pas possible de définir le tém. de suppr. pour le coll. cts &1
Quelle est la cause de ce problème? The deletion flag cannot be set for product cost collector &V1& for one or more of the following reason...
KOSA121
Le domaine d'activité est obligatoire pour la société &1
Quelle est la cause de ce problème? A business area is mandatory in company code &V1&. You must therefore assign a business area to the pro...
KOSA122
&1 collecteur(s) de coûts par produit créé(s)
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
Cliquez sur ce lien pour rechercher tous les messages SAP.