How To Fix KJ220 - Provisions pr coûts attendus ne peuvent pas être réparties sur ID lignes


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KJ - Cost Object Controlling for Make-to-Order Production

  • Message number: 220

  • Message text: Provisions pr coûts attendus ne peuvent pas être réparties sur ID lignes

  • Show details Hide details
  • Quelle est la cause de ce problème?

    <DS:GLOS.3526B6A7AFAB52B9E10000009B38F974>Results analysis</> or the
    <DS:GLOS.3526B772AFAB52B9E10000009B38F974>WIP calculation</> process
    calculates <GL:reserves_for_unrealized_costs>reserves for unrealized
    costs</>. However, this value cannot be apportioned to the
    <GL:line_ID>line IDs</> because the method of apportionment in the
    valuation method cannot be used for apportionment at totals level. The
    problem could be due to the values of the object being such that the
    method of apportionment cannot be applied in a logical way, or because
    the apportionment resulted in division by zero or a field overflow.

    Réponse du système

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.

    Comment corriger cette erreur?

    Check the object. Change the planned values if appropriate.
    Go into Customizing and check the entries in the valuation methods. If
    necessary, call up the Expert Mode and choose a different method of
    apportionment, or select the indicator <DS:DE.EINZL_POST>Other
    apportionment</>. You can only make this setting in Customizing for
    results analysis, even if you want to calculate
    <DS:GLOS.3526B774AFAB52B9E10000009B38F974>work in process</> in the
    <DS:GLOS.3526B6E8AFAB52B9E10000009B38F974>Product Cost by Order or
    Product Cost by Period</> component. If you select the <LS>Other
    apportionment</> indicator, the program automatically switches to
    method of apportionment <ZH>Z</> if the originally specified method of
    apportionment cannot be used. Method of apportionment Z means
    apportionment on the basis of the apportionment numbers specified in
    the Update. If key figures have been created, each line ID receives the
    same portion.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP KJ220 - Provisions pr coûts attendus ne peuvent pas être réparties sur ID lignes ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker