Do you have any question about this error?
Message type: E = Error
Message class: KI -
Message number: 142
Message text: Activez les supports de coûts dans le périmètre analytique &1 dans &2
You have assigned to a cost object, although the "Cost object indicator
has not been set in controlling area &V1& in fiscal year &V2&.
As the "Cost object" indicator has not been set, you cannot execute a
check or a consistent data update in Controlling. The cost objects you
have entered can be used as a true account assignment object, but will
not be updated. If you also post to a cost center, this will only be
debited statistically.
If the limitations detailed under system activities do not present a
problem for you, you can ignore this error message.
To do this, see the Implementation Guide (IMG) "Controlling General"
under workstep <DS:SIMG.SIMG_CFMENUORK3OBA5>"Change Message Control"</>
(message class "KI", message number "142").
If you are using the "Cost object" field to archive your own information
for a posting in the SAP system, you should make use of the enhancement
to the account assignment block, which offers you user-defined fields.
See the IMG "Special Ledger" under <DS:SIMG.SIMG_XXAK_OXK3>"Maintain
account assignment block"</>.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KI142
- Activez les supports de coûts dans le périmètre analytique &1 dans &2 ?Get instant SAP help. Start your 7-day free trial now.
KI141
Activez les projets dans le périmètre analytique &1 dans &2
Quelle est la cause de ce problème? You have assigned to a WBS element or a network, although the "Project" indicator has not been set in...
KI140
Activez la gestion des ordres dans le périmètre analytique &1 dans &2
Quelle est la cause de ce problème? You assigned an order to an account although Order Management is not active in controlling area &V1& in...
KI143
Activez les biens immobiliers dans le périmètre analytique &1 dans &2
Quelle est la cause de ce problème? You have assigned to a real estate object, although Real Estate is not active in controlling area &V1& ...
KI144
Activez le compte de résultat dans le périmètre analytique &1 dans &2
Quelle est la cause de ce problème? You have assigned to a profitability segment, although Profitability Analysis is not active in controlling area...
Cliquez sur ce lien pour rechercher tous les messages SAP.