Do you have any question about this error?
Message type: E = Error
Message class: KG - CO-PA Planning
Message number: 803
Message text: Tous les objets de résultat ne peuvent pas être traités -> cf. descriptif
You cannot maintain all of the profitability segments in the current
transaction. This could be due to the following:
RESET N1
Errors occurred when characteristic values were derived for the
profitability segments.
If this is the case, you can display the error messages under the menu
option "Extras -> Error logs -> Derivation".
Errors occurred which the system was checking the combination of
characteristics.
To see the corresponding error messages, choose "Extras -> Error logs
-> Combinations".
If you did not specify a unit of measure in the current planning
session, you <ZH>cannot</> plan the quantity field if
data with different units already exists
or
the unit in which the existing data was planned is different from the
one found during characteristic derivation (usually the unit from the
material master record, if you are planning a material).
You can see these quantity fields by selecting the menu option "Extras
-> Error logs -> Units".
You can display the corresponding line items using the function
"Display line items".
Planning is not allowed for the version you selected.
If you have defined a plan structure for the plan version you are
processing, the system checks the profitability segments you changed
against the plan structure.
You can display the corresponding error messages by selecting the menu
option "Extras -> Error logs -> Plan structure".
RESET N1
Execute the transaction again when the other users are finished.
Correct the errors in the derivation rules. For more detailed
information about why the error occurred, see the long text in the
error log for derivation.
Correct the cause of the error. To see why the error occurred, look in
the error log for combinations.
If you want to plan the quantity fields anyway, you need to try and
find out which units were planned incorrectly.
You can then reset this plan data explicitly in online planning (by
selecting the units explicitly) or using the function "Complete plan ->
Delete".
Mark the plan version as open for planning.
Maintain the plan structure to include the segments you wish to plan.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KG803
- Tous les objets de résultat ne peuvent pas être traités -> cf. descriptif ?Get instant SAP help. Start your 7-day free trial now.
KG802
Veuillez indiquer une période valable (l'exercice & comporte & périodes)
Quelle est la cause de ce problème? You have entered an invalid period for the year &V1&. Le système émet un message d'erreur et ne vous ...
KG801
& & non prévu (vérifier entrée)
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
KG804
Les données p-budg. sont enreg. ss nº pce & - ts les obj. ne st pas enr.
Quelle est la cause de ce problème? Some of the objects you entered contain errors.Réponse du système Objects with errors were not posted. All o...
KG805
Le schéma de budgétisation & comprend des erreurs
Quelle est la cause de ce problème? You have defined characteristic values of the dimension &V2& to an element of the planning layout &...
Cliquez sur ce lien pour rechercher tous les messages SAP.