Message text: L'unité & ne peut pas être convertie dans l'unité & de la nature compt.
In the resource master data record, you have linked the unit of measure
&V1& of the resource with the unit of measure &V2& of cost element &V3&
<DS:TRAN.KA03>Display cost element</>
However, this is only permitted if the units of measure can be
converted into one another. This means that both units of measure must
have the same dimension (for example, time, length or weight). Your
entry does not meet this condition.
Correct your entry.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
K8716
- L'unité & ne peut pas être convertie dans l'unité & de la nature compt. ?Get instant SAP help. Start your 7-day free trial now.
K8715
La désignation de la ressource n'a pas été gérée.
Quelle est la cause de ce problème? Resource &V1& has been created without a name.Réponse du système The processing of resource &V1&...
K8714
L'unité & ne peut pas être convertie dans l'unité & de l'article.
Quelle est la cause de ce problème? In the resource master data record, you have linked the unit of measure &V1& of the resource with the u...
K8717
L'unité & ne peut pas être convertie dans l'unité & de l'élément d'agr.
Quelle est la cause de ce problème? In the resource master data record, you have linked the unit of measure &V1& of the resource with the u...
K8718
La revalorisation des prix des ressources a été interrompue.
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
Cliquez sur ce lien pour rechercher tous les messages SAP.