Do you have any question about this error?
Message type: E = Error
Message class: IP - Messages for preventive maintenance
Message number: 447
Message text: Aucune activité anuelle saisie pour le point de mesure &
The <GL:measuring_point>measuring point</> has been defined as a
<GL:counter>counter</>. If a counter is to be used in a
<GL:maintenance plan>maintenance plan</>, you must enter an annual
estimate to allow <GL:maintenance plan scheduling>scheduling</> to take
place in regular <GL:plant maintenance>maintenance</>.
If you are maintaining a measuring point, you will receive this message
in the form of a note only. However, you can only change the counter if
it is already being used in a maintenance plan, and if the annual
estimate has been maintained. You can no longer delete the counter.
If you are maintaining or scheduling a maintenance plan, processing
will <ZH>not</> be continued.
If you are maintaining a measuring point, you must only enter an
<GL:annual_estimate>annual estimate</> if the measuring point is to be
used in a maintenance plan.
If you are maintaining a maintenance plan, enter an annual estimate in
another session, or enter a counter for which an annual estimate has
already been maintained.
If you are scheduling a maintenance plan, enter an annual estimate in a
different session.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
IP447
- Aucune activité anuelle saisie pour le point de mesure & ?Get instant SAP help. Start your 7-day free trial now.
IP446
Attention : date planifiée avec n° d'appel &1 ne peut être confirmée
Quelle est la cause de ce problème? You have tried to confirm a <GL:maintenance_call>maintenance call</> before it has actually been ca...
IP445
Ignorer cet appel est impossible
Quelle est la cause de ce problème? In your <DS:GLOS.multiple_counter_plan>multiple counter plan</>, you have indicated that the last &...
IP448
Encore aucune val.de cpteur saisie pour unité &, point de mes. &
Quelle est la cause de ce problème? The <GL:counter>counter</> data has not been fully maintained for <GL:maintenance_plan_schedulin...
IP449
Un ordonnancement avec décalage initial est d'abord effectué
Quelle est la cause de ce problème? You have tried to schedule the <GL:preventive_maintenance_plan>maintenance plan</> for the first ti...
Cliquez sur ce lien pour rechercher tous les messages SAP.