Do you have any question about this error?
Message type: E = Error
Message class: IP - Messages for preventive maintenance
Message number: 126
Message text: Gérez soit un cycle soit un décalage
You have tried to create a new <GL:maintenance_cycle>maintenance
cycle</> or have changed an existing maintenance cycle. However, you
have specified neither a cycle duration nor an offset.
The system can only take a maintenance cycle into account during
<GL:scheduling>scheduling</> if you enter either a cycle duration or an
offset.
INCLUDE 'KEINE-VERARBEITUNG' OBJECT DOKU ID TX LANGUAGE EN
If the maintenance cycle is to be repeated at <ZH>regular</> intervals,
enter the cycle duration. If the first time the cycle is due is
different to the cycle duration, enter the offset as well to define the
first time it is to be carried out.
If the maintenance cycle is only to be carried out <ZH>once</>, enter
the offset and the offset short text.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
IP126
- Gérez soit un cycle soit un décalage ?Get instant SAP help. Start your 7-day free trial now.
IP125
Valeur de compteur impossible pour cycles d'entretien basé sur le temps
Quelle est la cause de ce problème? You have tried to display the <GL:planned_counter_reading>planned counter reading</> for a time-bas...
IP124
Compteurs décroissants non autorisés
Quelle est la cause de ce problème? You have tried to assign a <GL:counter>counter</> that runs backwards to a <GL:preventive_mainte...
IP127
Cycle saisi après ordonnancem. ; définissez des dates valides.
Quelle est la cause de ce problème? The <GL:preventive_maintenance_plan>maintenance plan</> has been scheduled, but the <GL:maintena...
IP128
Seules des valeurs sans décimale sont autorisées
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
Cliquez sur ce lien pour rechercher tous les messages SAP.