How To Fix HRPIQ000291 - Le plan des études ne devrait pas être modifié


SAP Error Message - Details

  • Message type: E = Error

  • Message class: HRPIQ000 - Messages in Development Class PMIQ

  • Message number: 291

  • Message text: Le plan des études ne devrait pas être modifié

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You have tried to change the plan of program &V1& &V2& &V3&.
    This is not permitted because other infotypes or relationships that are
    linked to the program plan exist for this program in the validity
    period, and a change could lead to data inconsistencies.

    Réponse du système

    The program plann cannot be changed.

    Comment corriger cette erreur?

    Change the validity period of the program plan or the validity period
    of the infotypes and relationships that link the program to the program
    plan. Check the data in the infotype <LS>Program Credits</> (1735) and
    the relationships <LS>consists of</> (A500) and <LS>uses</> (B509).

    Procédure pour les administrateurs système

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP HRPIQ000291 - Le plan des études ne devrait pas être modifié ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant