Message type: E = Error
Message class: HRHCP00_PLAN - Messages About Personnel Cost Plan
Message number: 095
Message text: Erreur implémentation BAdI ; période élément de coûts non valable
The derived and additional cost items were changed in an implementation
of the BAdI HRHCP00_DERIVE_VALU with the method
CHANGE_DERIVED_COSTITEMS. The return table contains cost items whose
period exceeds the validity of the object. The cost object is valid
from &V3& to &V4&, but a cost item exists that is valid from &V1& to
&V2&.
The system does not process these cost items any further.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Check the BAdI implementation.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
HRHCP00_PLAN095
- Erreur implémentation BAdI ; période élément de coûts non valable ?Get instant SAP help. Start your 7-day free trial now.
HRHCP00_PLAN094
Erreur implémentation BAdI ; chevauchements de périodes
Quelle est la cause de ce problème? You have used the method &V1& of BAdI HRHCP00_DERIVE_VALU to determine the organizational grouping of c...
HRHCP00_PLAN093
Erreur implémentation BAdI ; périodes discontinues
Quelle est la cause de ce problème? In the enhancement (BAdI) HRHCP00_POST_PERIODS the posting periods have been changed. Since this change the pos...
HRHCP00_PLAN096
Erreur implémentation BAdI ; affectation erronée à imputation différente
Quelle est la cause de ce problème? The derived and additional cost items were changed in an implementation of the BAdI HRHCP00_DERIVE_VALU with th...
HRHCP00_PLAN097
Erreur implémentation BAdI ; période non valable
Quelle est la cause de ce problème? The object selection for the planning run was changed in an implementation of the BAdI HRHCP00_RUN_OBJSEL. The ...