Do you have any question about this error?
Message type: E = Error
Message class: GA - Allocations
Message number: 150
Message text: Imputation budg. pour ordre & non autorisée dans la version &
Order &V1& is used as a sender or receiver in the plan allocation used
with version &V2&. This order, however, is not a valid sender/receiver
because it is not integrated with planning.
An order is plan integrated if the corresponding indicator is activated
in the order's master data (current setting: "&V3&" ) and the indicator
"Plan integration with Cost Center Accounting" is set in the version
(current setting "&V4&" ).
Order &V1& is not a valid sender/receiver. Plan allocation continues.
If the order is to be used in plan allocation, the indicators named
above must be activated. See the current settings above to determine
which of these indicators needs to be set.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
GA150
- Imputation budg. pour ordre & non autorisée dans la version & ?Get instant SAP help. Start your 7-day free trial now.
GA149
Fin validation du cycle à l'aide de &1 : cf. protocole erreurs pr détails
Quelle est la cause de ce problème? During validation for the cycle definition &V1& occurred.Réponse du système Le système émet un mes...
GA148
Contrôle formel du cycle effectué (pas d'erreur)
Quelle est la cause de ce problème? The formal check of the cycle was successful.Comment corriger cette erreur? Note that the system did not make ...
GA151
Imputation budg. pour l'élément OTP n'est pas autorisée dans version &
Quelle est la cause de ce problème? WBS element &V1& is used as a sender or receiver in the plan allocation used with version &V2&....
GA152
Indiquez tout d'abord un nom de cycle et sa date de début de validité.
Quelle est la cause de ce problème? Befor you enter segments or make selections using F4 (input help), you must enter the cycle and its start date....
Cliquez sur ce lien pour rechercher tous les messages SAP.