Do you have any question about this error?
Message type: E = Error
Message class: FMAVC - Message class AVC funds management
Message number: 111
Message text: Vérification de la clé de regroupement de l'objet de contrôle impossible
The <DS:DE.FMKU_GROUPING_KEY>grouping key</> of the budget address &V3&
&V4& and of the availability control object &V1&&V2& must be identical.
But the current transaction cannot verify this condition, because it is
not possible to assign a consistent grouping key to the budget address
&V3&&V4&, which the control object is derived from.
Processing of the current transaction stops.
Verify the budget address &V3&&V4& or the <DS:DE.FMBS_ADDRRULE>strategy
for deriving budget addresses</> in the
<DS:SIMG._ISPSFM_N_DERIVE_BO>Customizing of BCS Budget Structure</> and
check the implementation of the Business Add-In (BAdI)
<DS:SIMG.FMKU_GROUPING_KEY>FMKU_GROUPING_KEY</>.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
FMAVC111
- Vérification de la clé de regroupement de l'objet de contrôle impossible ?Get instant SAP help. Start your 7-day free trial now.
FMAVC110
Objet de contrôle non valable : clé de regroupement incohérente
Quelle est la cause de ce problème? The control object &V3&&V4& (FM area &V2&) of the <DS:DE.BUAVC_ALDNR>availability...
FMAVC109
Horizon de contrôle dérivé pour le contrôle des disponibilités non val.
Quelle est la cause de ce problème? The <DS:DE.BUAVC_CHECKHORIZON>Checking horizon</> &V1&, which has been derived for availabi...
FMAVC112
Objet de contrôle non valable : clé de regroupement &1 non valable
Quelle est la cause de ce problème? The <DS:DE.FMKU_GROUPING_KEY>grouping key</> &V1& assigned to the availability control obje...
FMAVC113
La dérivation de l'objet CDis. a échoué (voir texte descriptif).
Quelle est la cause de ce problème? An error occurred during the derivation step <ZH>&V1&</> (step type &V2& ) of the a...
Cliquez sur ce lien pour rechercher tous les messages SAP.