Do you have any question about this error?
Message type: E = Error
Message class: FINS_IC_CUST - Manage Currencies: Customizing
Message number: 049
Message text: Modifications des options de conversion de devises globales trouvées
The current configuration for global conversion settings, which are used
in the project, have been compared with a snapshot of these settings
that was taken at the time when preparations were completed.
If differences in project ledgers are found when you try to complete the
project, the system displays these differences.
In this case, a difference was found related to currency type &V1& and
setting: "&V2&" (&V3&). The technical fieldname is "&V4&".
In general, subsequent configuration changes are not allowed and cannot
be handled properly during data processing. As a result, the definition
of currency type &V1& may have caused inconsistencies.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
In non-production systems, you can change the message type (and even
suppress the message) in
<DS:TRAN.OBA5>Message Control by User</> using the application area
FINS_IC_CUST and message = 049.
If the message type is I (Info), S (Success) or W (Warning), the project
can then be completed.
Note: This function is only supported in non-production systems.
Intermediate changes to the project configuration will always cause an
error message in production systems and the project cannot be completed.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
FINS_IC_CUST049
- Modifications des options de conversion de devises globales trouvées ?Get instant SAP help. Start your 7-day free trial now.
FINS_IC_CUST048
Options de conversion de devises modifiées (société &1, type devise &2)
Quelle est la cause de ce problème? The currency conversion settings for company codes were changed after the preparation phase of the current proj...
FINS_IC_CUST047
Options de conversion de devises globales modifiées (type de devise &1)
Quelle est la cause de ce problème? The global currency conversion settings were changed after the preparation phase of the current project was com...
FINS_IC_CUST050
Modifications des options de conversion de devises trouvées pour sociétés
Quelle est la cause de ce problème? The current conversion settings for company codes have, which are used in the project, have been compared with ...
FINS_IC_CUST051
Le ledger d'extension &1 sera traité, bien que non standard.
Quelle est la cause de ce problème? The extension ledger &V1& will be processed during data processing in the project cockpit. Extension le...
Cliquez sur ce lien pour rechercher tous les messages SAP.