Do you have any question about this error?
Message type: E = Error
Message class: FINS_IC_CUST - Manage Currencies: Customizing
Message number: 012
Message text: Modifications trouvées dans le ledger &1, option : "&2".
The current configuration settings of all ledgers, which are assigned to
the project<(>,<)> have been compared with a snapshot of these settings
that was taken at the time when preparations were completed.
If differences in project ledgers are found when you try to complete the
project, the system displays these differences.
In this case, a difference was found for ledger &V1& in setting: "&V2&"
(&V3&). The technical fieldname in the ledger table is "&V4&".
In general, subsequent configuration changes are not allowed and cannot
be handled properly during data processing. As a result, the current
data of ledger &V1& might be inconsistent.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
In non-production systems, you can reset the data in the project cockpit
first and then reset <LS>Complete Preparations</>. In this way, the
snapshot of the project configuration settings is updated the next time
you perform the <LS>Complete Preparations</> step.
Alternatively, you can change the message type (and even suppress the
message) in
<DS:TRAN.OBA5>Change Message Control</> using the application area
FINS_IC_CUST and message = 012.
If the message type is I (Info), S (Success) or W (Warning), the project
can then be completed.
Note: This function is only supported in non-production systems.
Intermediate changes to the project configuration will always cause an
error message in production systems and the project cannot be completed.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
FINS_IC_CUST012
- Modifications trouvées dans le ledger &1, option : "&2". ?Get instant SAP help. Start your 7-day free trial now.
FINS_IC_CUST011
Entrée manquante pour ledger &1, société &2
Quelle est la cause de ce problème? The configuration settings of the current project were changed after the preparation phase of the project was c...
FINS_IC_CUST010
Modifications trouvées dans l'attribut "&1" du ledger &2, société &3
Quelle est la cause de ce problème? The project configuration changed after the preparation phase of the project was completed. If you make any cha...
FINS_IC_CUST013
Modifications trouvées en lien avec le ledger &1, société &2
Quelle est la cause de ce problème? The ledger settings were changed after the preparation phase of the current project was completed. Differences ...
FINS_IC_CUST014
Compte manquant dans catégorie d'ajustement "&1" pour sté &2/plan cpt. &3
Quelle est la cause de ce problème? For company code &V2&, the adjustment category "&V1&" in chart of accounts &V3&am...
Cliquez sur ce lien pour rechercher tous les messages SAP.