How To Fix FCOM_PLANNING_CORE124 - L'imputation des coûts s'est terminée en boucle ; veuillez corriger.


FCOM_PLANNING_CORE124 - Overview

  • Message type: E = Error

  • Message class: FCOM_PLANNING_CORE - Messages for Package FCOM_PLANNING_CORE

  • Message number: 124

  • Message text: L'imputation des coûts s'est terminée en boucle ; veuillez corriger.

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The planning function requires that all primary costs are able to be
    allocated to end cost objects.
    End cost objects are<(>,<)> for example<(>,<)> cost centers, from which
    no further allocation is defined.
    A group of cost objects containing cost object &V1& of type &V2&
    (InfoObject &V3&) allocates their primary costs in a cycle, because the
    group is not connected to any end cost object.
    Therefore<(>,<)> the primary costs of this group are never allocated to
    any end cost object.

    Réponse du système

    The system aborts processing of the planning function.

    Comment corriger cette erreur?

    Analyze the allocation factors defined for the group of cost objects
    containing cost object &V1& and ensure that the group is connected to
    end cost objects.

    Procédure pour les administrateurs système

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


FCOM_PLANNING_CORE124 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant