Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix FARR_PROCESS_CHECK059 - Combin.contrats &2 et &3 avc dte entrée vig. future &1 non prise en chrge


FARR_PROCESS_CHECK059 - Overview

  • Message type: E = Error

  • Message class: FARR_PROCESS_CHECK - Messages for Input Checks in Process Layer

  • Message number: 059

  • Message text: Combin.contrats &2 et &3 avc dte entrée vig. future &1 non prise en chrge

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The effective date &v1& is later than the current system date. Contracts
    cannot be combined with an effective date later than the system date.

    Réponse du système

    The system stopped the combination of the contracts.

    Comment corriger cette erreur?

    During contract combination, choose an effective date that meets the
    following criteria:
    +,,is in an open Revenue Accounting period (see
    <DS:SIMG.FARR_CLOSE>Open and Close Revenue Accounting Periods</>)
    +,,is not later than the system date (&DATE&)
    +,,is not earlier than the latest effective date of a prior change on
    the source and/or target contract (see
    <DS:NA.FARR_CONTR_LIFECYCLE069>Effective Date of Preceding Change</>)

    Procédure pour les administrateurs système

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


FARR_PROCESS_CHECK059 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author