Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix FARR_MSG_CUSTOM035 - L'OP basée sur le temps &1 ne peut pas avoir de produit en cours.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FARR_MSG_CUSTOM - Customizable Messages for Revenue Accounting

  • Message number: 035

  • Message text: L'OP basée sur le temps &1 ne peut pas avoir de produit en cours.

  • Show details Hide details
  • Quelle est la cause de ce problème?

    Time-based performance obligation cannot have open revenue.

    Réponse du système

    During Initial Load, a time-based POB is created that has:
    An End-date that is not initial and occurs before the transfer date
    An allocated amount that is greater or less than the recognized revenue
    from the legacy system
    For the POB, no additional revenue is recognized by Revenue Accounting.
    As the end date is earlier than the transfer date, Revenue Accounting
    does not know how to recognize the delta revenue between allocated
    amount and recognized revenue from the legacy system.

    Comment corriger cette erreur?

    This message can be customized in the message control Customizing
    setting. The system responds depending on whether the status of this
    message is set to Warning or Error.
    Warning: This scenario is reported as a warning. Please be aware that
    the system cannot automatically handle the inconsistent data. You need
    to manually guarantee the delta revenue amount that will be passed to
    revenue accounting yourself.
    Error: The system will prevent this inconsistent data from being saved.
    Therefore, contract creation will fail.

    Procédure pour les administrateurs système

    Example 1: For a time-based POB, the contractual price is 100 EUR, and a
    credit memo with a value of -20 EUR occurs in the legacy system.
    Therefore, revenue of 80 EUR is recognized in the legacy system.
    While processing initial load, the allocated amount of 100 EUR and the
    recognized revenue of 80 EUR is passed to revenue accounting to generate
    a contract. If the end date is earlier than the transfer date, the
    message is set to Warning.
    Afterwards, when processing the invoice RAI item of the credit memo, the
    allocated amount is adjusted to 80 EUR.
    Example 2: For a time-based POB, the contractual price is 100 EUR. There
    is no revenue posted in the legacy system, and the POB has been rejected
    in the legacy system.
    When processing initial load, the allocated amount of 100 EUR and
    recognized revenue of 0 EUR is passed to revenue accounting to generate
    a contract. If the end date is earlier than the transfer date, the
    message cannot be set to Warning as there is no further event to change
    the allocated amount or recognize the revenue.

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP FARR_MSG_CUSTOM035 - L'OP basée sur le temps &1 ne peut pas avoir de produit en cours. ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant