How To Fix FARR_INFLIGHT_CHECK051 - C26: mont. du fractionnement prospectif incohér. pour OP &1 ds contrat &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FARR_INFLIGHT_CHECK -

  • Message number: 051

  • Message text: C26: mont. du fractionnement prospectif incohér. pour OP &1 ds contrat &2

  • Show details Hide details
  • Quelle est la cause de ce problème?

    Contract change can either be:
    ?Contract modification
    ?Change of estimates.

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.

    Depending on the Customizing ( Configure Accounting Principle-specific
    Settings) for a company code and accounting principle, one or the other
    is applied when the scope of a contract is changed.
    The change mode for a POB is determined by the field CHANGE_MODE (only
    in the buffer, not written to database) and can be one of the following:
    ?'P' or 'V' prospective change
    ?'R' retrospective change
    ?' ' (empty) no change
    Prospective change
    In case of a prospective change the system performs a prospective split
    on the deferral items. The deferral item which corresponds to an open
    reconciliation key in the period of the contract change is flaged with
    the prospective split flag (PRO_SPLIT = 'X').
    The split amount represents the revenue amount posted plus the scheduled
    revenue amount from the period prior to the current change.
    The example below illustrates this:
    RECON_KEY,,POB_ID,,CONDITION_TYPE,,REV_AMT_DELTA,,REV_AMT_POSTED,,
    PRO_AMT_CUMULATE,,HAS_PRO_SPLIT,,LATEST_DEFITEM
    201802001,,POB1,,PR00,,1000.00,,0.00,,0.00,,-,,-
    201803001,,POB1,,PR00,,1000.00,,1000.00,,0.00,,-,,-
    201803002,,POB1,,PR00,,- 500.00,,1000.00,,1000.00,,X,,-
    201804001,,POB1,,PR00,,1000.00,, 500.00,,1000.00,,-,,-
    201805001,,POB1,,PR00,,1000.00,,1500.00,,1000.00,,-,,X
    In this example, a contract modification was performed in period
    2018/03. Therefore the split amount is calculated and the prospective
    split flag set. All deferral items, beginning from the contract change
    period, are updated with the split amount (PRO_AMT_CUMULATE).
    If the split amount is not the total of the posted and scheduled revenue
    from the previous period (not necessarily previous reconciliation key!),
    a C26 inflight check error is raised.

    Réponse du système

    The RAI processing is stopped or the manual transaction from the UI is
    stopped.

    Comment corriger cette erreur?

    You can search for SAP notes related to inflight check C26 by using the
    terms FARR_INFLIGHT_CHECK and C26.
    You can also check if there is inconsistent data already in the system.

    Procédure pour les administrateurs système


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP FARR_INFLIGHT_CHECK051 - C26: mont. du fractionnement prospectif incohér. pour OP &1 ds contrat &2 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author